jab1
The Full Monty
Posts: 20,592
Thanks: 6,825
Fixes: 305
Registered: ‎24-02-2012

Re: A second 'follow my order' thread

Looking at that - all they have to do is drill a hole through the wall and install the CSP and ONT  - half-an-hours job for one man.

John
mwwagain
Grafter
Posts: 26
Thanks: 4
Registered: ‎03-12-2024

Re: A second 'follow my order' thread

More can kicking from OR despite asking that very question.....

 

PN message after conversing with OR:

"I can see the Chief engineer is required to carry out external cabeling work before the internal installation can be progressed. I have messaged the case handler to confirm this."

 

Assumption from PN is that 'external' in OR-speak just means something not 'internal' - in other words anything that sits between the world and my door. 

So could there be something still missing in the chain to the exchange(s) ?

However I happened to meet the OR test and signoff manager who showed me the fibre 'head'  (CBT) in my chamber was working in November - as he was there to sign off all the work to that point.  This is a rural Scottish 'R100' setup so sign off had financial implications - as in OR wanted to be paid for it !

 

Back 'on hold' to 15 April