How long from phone install to braodband activation?
19-11-2022 11:23 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report to Moderator
How long does it normally take from when the Openreach engineer calls and installs the phone line to Plusnet supplying the router and the broadband going live?
Its now been 2 weeks and no messages or anything from Plusnet.
Re: How long from phone install to braodband activation?
20-11-2022 7:47 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report to Moderator
If they do not happen the same day, then usually within 5 days.
Is this simply a case that Plusnet have not notified you that the service is live ... and you have not tried to make the connection? There is a hint in your post that you have not received the router. These are sent by tracked delivery - if you were out then the Post Office should have left a missed delivery card. @bobpullen
There is the possibility that something has gone horribly wrong - this generic guidance might help...
Delayed orders
There are a multitude of reasons why order processing might be reported as delayed and usually it is nothing to be too concerned about, but there are exceptions. The following are some of the common causes of orders being delayed...
- The user told their existing supplier that they are moving and the consequential action by their existing supplier will prevent any new ISP placing orders to take over the service - this needs affirmative action with the existing supplier
- The existing circuit to the property cannot be identified in BT Openreach's systems due to errors in their data - this can give rise to the need for special processes (ORDI and Bridge cases) with BTOR to correct THEIR data
- Something was not quite right with the order raised by Plusnet - these are usually sorted quickly
- BT Openreach do not have engineering resources available in the usual timeframe
To see what is happening in detail, check the ticket history on your account - log into the portal in another tab, return here and click the PN TICKET link below. Look at the details of the tickets; if there appears to be no recent activity, contact support.
In another browser tab, login into the Plusnet user portal BEFORE clicking the fault & ticket links
Superusers are not staff, but they do have a direct line of communication into the business in order to raise issues, concerns and feedback from the community.
If this post helped, please click the Thumbs Up and if it fixed your issue, please click the This fixed my problem green button below.
Re: How long from phone install to braodband activation?
21-11-2022 12:05 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report to Moderator
I'm no expert in this field, but I'm not convinced the broadband order is in flight. I'll see if I can get somebody to take a look. The hub won't be dispatched until a few days prior to broadband activation.
Bob Pullen
Plusnet Product Team
If I've been helpful then please give thanks ⤵
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Plusnet Community
- :
- Forum
- :
- Help with my Plusnet services
- :
- My Order
- :
- Re: How long from phone install to braodband activ...