@Baldrick1 See my comment in reply to @RobPN  -  I am well aware that OR's 'customer' is PN, but it would help the EU's if the ISP kept their customers informed. It is possible, I was kept fully up-to-date by my ISP when moving from FTTC to FTTP.

John
mrwizard
Dabbler
Posts: 15
Thanks: 1
Registered: ‎20-02-2022

Re: Issue with full fibre order

Seems to just be that they are waiting for an update from Openreach when the MDU install will be done. They are expecting an update by the 31st Jan.

 

I was also told that the MDU box will be the size of one of the green street cabinets. But I am not sure about that as it is only 7 flats. 

bmc
Hero
Posts: 4,063
Thanks: 1,449
Fixes: 62
Registered: ‎28-02-2017

Re: Issue with full fibre order

@mrwizard 

I'm pretty confident it won't be the size of a street cabinet though it will be larger than the CSP used for single properties. I don't know what equipment OR use, but this is a "Outdoor 12 Fibers Multi Dwelling Unit MDU Fiber Optic Cable Box Wall Mount Fiber Termination Box"

MDU Unit.JPG

Brian

mrwizard
Dabbler
Posts: 15
Thanks: 1
Registered: ‎20-02-2022

Re: Issue with full fibre order

Hopefully that is what we will end up with as 12 fibres to cover our flats has been mentioned. Also the black box on the wall for the current FTTC is about the same size.