Full fibre activation date
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Plusnet Community
- :
- Forum
- :
- Help with my Plusnet services
- :
- My Order
- :
- Re: Full fibre activation date
Full fibre activation date
25-08-2024 2:15 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report to Moderator
Re: Full fibre activation date
25-08-2024 2:56 PM - edited 25-08-2024 2:56 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report to Moderator
@FeeConn Your FF connection should 'go live' once the installation engineer has installed the ONT, or within a very short time after they have got Opereach to 'switch it on'. The installation takes about 1 - 1.1/2 hours, and once all the lights on the ONT are green, and the router connected, they will (or certainly should) test it to ensure it is working and delivering the contracted speed. Plusnet do not need to give you a 'live' date.
Re: Full fibre activation date
25-08-2024 3:45 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report to Moderator
Re: Full fibre activation date
25-08-2024 3:46 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report to Moderator
No reason why it shouldn't.
Re: Full fibre activation date
25-08-2024 4:17 PM - edited 25-08-2024 4:18 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report to Moderator
I assume you know your landline ceases with a FTTP service.
I believe OR engineers have a test account they can use to confirm things are working. This would be programmed into their work laptop.
Brian
Re: Full fibre activation date
25-08-2024 4:19 PM - edited 25-08-2024 4:21 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report to Moderator
I would imagine they do, @bmc - you are , I understand you are advised of that during the sign-up/change-over journey.
My (Quinns) installer did not have a laptop - he merely checked my connection - or more correctly, waited until I had.
Re: Full fibre activation date
25-08-2024 4:51 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report to Moderator
Re: Full fibre activation date
25-08-2024 4:55 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report to Moderator
It depends, @FeeConn - mine wasn't, but the ONT was installed at a completely different location to my old master socket. The best thing to do is discuss it with the engineer on the day. They are usually very helpful/obliging.
Re: Full fibre activation date
25-08-2024 5:28 PM
- Mark as New
- Bookmark
- Subscribe
- Subscribe to RSS Feed
- Highlight
- Report to Moderator
If you have an overhead feed then you could ask for the line to be removed. With an u/g feed I suspect they would leave the copper cable in place.
If the ONT is going in the same general location of the Master Socket they night use this for the ONT (or they might not). As already stated, speak to them before the install starts.
Brian
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Plusnet Community
- :
- Forum
- :
- Help with my Plusnet services
- :
- My Order
- :
- Re: Full fibre activation date